Other
Pipelaying operations in progress until further notice by LB200 between 62-19.9N 004-43.2E and 65-06.4N…
HYDROLANT 785/99
- issued
- 1999-04-21 09:10Z
- status
- cancelled 1999-07-02 09:20Z (archive)
- position
- 63.719, 5.759
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
PIPELAYING OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY LB200 BETWEEN 62-19.9N 004-43.2E AND 65-06.4N 006-47.9E. WIDE BERTH REQUESTED.
This area · other warnings
15 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
23
- Yellow buoy with 300 meter long cable adrift in vicinity 65-06.50N 006-18.80E at 030830Z sep2023-09-04
- Hywind tampen floating offshore wind farm turbines unlit in: a. 61-19.10N 002-15.30E2022-11-30
- Hywind tampen floating offshore wind farm turbines unlit in: a. 61-22.10N 002-15.20E2022-11-27
- All navigational aids at platform magnus 211/12 61-37.20N 001-18.40E inoperative2022-11-12
- All turbines at hywind tampen floating offshore wind farm 61-20.10N 002-15.50E unlit2022-10-09
- Platform heidrun 65-19.53N 007-18.95E unlit until 16 sep2022-08-20
Season · when other warnings happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- HYDROLANT messages in force 020800Z jul 99cancelled by · 1999-07-02
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
68 other warnings in force · see all
Other
Everything the classifier did not place elsewhere. All current other warnings →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.