Cable ops
Seismic survey 130300Z to 200259Z oct by M/V nps sanco star and M/V nps ocean europe towing 300 meter long…
Brazil-southeast Coast · HYDROLANT 2393/12
- issued
- 2012-10-13 00:48Z
- status
- cancelled 2012-10-21 03:59Z (archive)
- self-cancels
- 2012-10-20 03:59Z
- authority
- NAVAREA V E 1379/12 130028Z OCT 12.
- position
- -22.337, -39.995
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-SOUTHEAST COAST. 1. SEISMIC SURVEY 130300Z TO 200259Z OCT BY M/V NPS SANCO STAR AND M/V NPS OCEAN EUROPE TOWING 300 METER LONG CABLES IN AREA BOUND BY 22-18.07S 040-01.40W, 22-20.83S 039-56.92W, 22-22.35S 039-58.00W, 22-19.57S 040-02.48W. SIX MILE BERTH REQUESTED. 2. CANCEL THIS MSG 200359Z OCT 12.
This area · cable & pipeline work
1665 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
21
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Seismic survey in progress until 15 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-08
- Seismic survey in progress until 08 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-01
- Seismic survey 17 thru 24 sep by M/V bgp challenger towing 12000 meter long cable in area bound by 25-07S…2016-09-16
- Brazil-southeast coast DNC 012016-08-11
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- HYDROLANT warnings in force 200900Z oct 12cancelled by · 2012-10-20
Nearby now · within 120 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 4.2 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 23.6 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 24.4 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 36.7 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 49.6 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 50.9 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 54.5 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 61.4 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 61.5 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 67.2 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 81.8 nm
- Underwater operations 1100Z to 2100Z daily 13 thru 22 aug by M/V comando b and M/V am kirti in 20-23.90S…Surveys · 116.8 nm
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.