Cable ops
Seismic survey in progress until 170159Z dec by M/V veritas viking II towing six 6500 meter long cables in…
HYDROLANT 3167/01
- issued
- 2001-12-13 13:42Z
- status
- cancelled 2001-12-16 13:50Z (archive)
- self-cancels
- 2001-12-17 02:59Z
- cancels
- HYDROLANT 3141/01HYDROLANT 3156/01
- authority
- NAVAREA V 1837/01 131130Z DEC; MARISICILIA 472/01 122100Z DEC
- sea
- South Atlantic Ocean
- position
- -24.943, -43.135
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 170159Z DEC BY M/V VERITAS VIKING II TOWING SIX 6500 METER LONG CABLES IN AREA BOUND BY 24-53.09S 043-47.06W, 24-52.49S 042-29.51W, 25-00.43S 043-47.07W, 25-00.22S 042-27.46W. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 3141/01(53), AID RESTORED. 3. CANCEL HYDROLANT 3156/01. 4. CANCEL THIS MSG 170259Z DEC.
This area · cable & pipeline work
1966 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
23
- Cable operations in progress until 30 mar 24 by cableship durable in: a. 24-05.68S 046-30.76W2023-12-27
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Seismic survey in progress until 09 oct by M/V sw diamond towing nine 225 meter long cables in area bound by…2022-10-07
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Underwater operations in progress until 142359Z aug by cableship ile de brehat in: a. 24-03.0S 046-31.4W2017-07-14
- Underwater operations in progress until 132300Z jul by cableship ile de brehat in: a. 24-03.8S 046-29.2W2017-06-15
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Capo santa croce light 37-14.5N 015-15.5E at reduced intensitycancels · 2001-12-11
- Seismic survey in progress until 150159Z dec by M/V veritas viking II towing six 6500 meter long cables in…cancels · 2001-12-12
- Capo santa croce light 37-14.5N 015-15.5E at reduced intensityreplaced · 2001-12-11
- Seismic survey in progress until 150159Z dec by M/V veritas viking II towing six 6500 meter long cables in…replaced · 2001-12-12
- Seismic survey in progress until 200300Z dec by M/V veritas viking II towing six 6500 meter long cables in…cancelled by · 2001-12-16
Nearby now · within 120 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.