Cable ops
Seismic survey 030001Z to 122359Z dec by M/V ramform atlas towing 14 10000 meter long cables in area bound…
Eastern North Atlantic · Mauritania · HYDROLANT 3253/16
- issued
- 2016-12-02 21:05Z
- status
- cancelled 2016-12-11 16:07Z (archive)
- self-cancels
- 2016-12-13 00:59Z
- authority
- NAVAREA II 366/16 022105Z DEC 16.
- position
- 16.773, -17.935
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
EASTERN NORTH ATLANTIC. MAURITANIA. DNC 01. 1. SEISMIC SURVEY 030001Z TO 122359Z DEC BY M/V RAMFORM ATLAS TOWING 14 10000 METER LONG CABLES IN AREA BOUND BY 17-33N 018-11W, 17-33N 017-26W, 16-04N 017-33W, 16-04N 018-33W. SEVEN MILE BERTH REQUESTED. 2. CANCEL THIS MSG 130059Z DEC 16.
This area · cable & pipeline work
43 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
23
- Cable operations in progress until 240001Z nov by M/V ile de batz along trackline joining 14-43.70N…2023-11-21
- Pipeline operations 22 jun thru 22 dec in areas within two miles of: a. 16-03.30N 016-52.50W2022-06-19
- Pipeline operations in progress until 22 jun in area within three miles of 16-04.00N 016-53.00W2022-06-12
- 77 km long seismic cables with 11 buoys possibly submerged or adrift in area bound by 14-36.36N 018-20.41W,…2019-11-28
- Cable operations 30 aug thru 20 sep by cableship pierre de fermat with submersible along trackline joining…2019-08-28
- Cable operations 050001Z to 070800Z may by cableship peter faber along trackline joining 14-40.2N 017-28.9W,…2019-05-04
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.