Cable ops
Seismic survey in progress until 190300Z mar by M/V alize towing eight 7000 meter long cables in area…
HYDROLANT 580/02
- issued
- 2002-03-13 06:10Z
- status
- cancelled 2002-03-19 04:00Z (archive)
- self-cancels
- 2002-03-19 04:00Z
- cancels
- HYDROLANT 559/02
- authority
- NAVAREA V 325/02 130358Z MAR 02; WZ 433/02 122138Z MAR 02
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 190300Z MAR BY M/V ALIZE TOWING EIGHT 7000 METER LONG CABLES IN AREA BETWEEN 26-10S 26-45S AND 044-30W 046-00W. FOUR MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 559/02(35). 3. CANCEL THIS MSG 190400Z MAR.
Timeline
- Dsc station port naguran 58-15N 006-10W inoperativecancels · 2002-03-11
- Dsc station port naguran 58-15N 006-10W inoperativereplaced · 2002-03-11
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.