Cable ops
Seismic survey 141800Z to 180300Z mar by M/V ramform explorer towing eight 6852 meter long cables in area…
HYDROLANT 591/02
- issued
- 2002-03-14 06:10Z
- status
- cancelled 2002-03-18 04:00Z (archive)
- self-cancels
- 2002-03-18 04:00Z
- cancels
- HYDROLANT 558/02
- authority
- NAVAREA V 329/02 140405Z MAR 02; WZ 440/02 131617Z MAR 02
- sea
- South Atlantic Ocean
- position
- -24.567, -44.117
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY 141800Z TO 180300Z MAR BY M/V RAMFORM EXPLORER TOWING EIGHT 6852 METER LONG CABLES IN AREA BOUND BY 24-25S 044-36W, 24-13S 043-54W, 24-43S 043-38W, 24-55S 044-20W. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 558/02(35). 3. CANCEL THIS MSG 180400Z MAR.
Activity windows · 1 in this warning
| opens (UTC) | closes (UTC) | local | length |
|---|---|---|---|
| 2002-03-14 18:00Z | 2002-03-18 03:00Z | — | 81 h |
Parsed from the warning text; outside these windows the area is normally not active, but the warning stays in force until cancelled.
This area · cable & pipeline work
1895 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
23
- Cable operations in progress until 30 mar 24 by cableship durable in: a. 24-05.68S 046-30.76W2023-12-27
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Seismic survey in progress until 09 oct by M/V sw diamond towing nine 225 meter long cables in area bound by…2022-10-07
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Underwater operations in progress until 142359Z aug by cableship ile de brehat in: a. 24-03.0S 046-31.4W2017-07-14
- Underwater operations in progress until 132300Z jul by cableship ile de brehat in: a. 24-03.8S 046-29.2W2017-06-15
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Dsc station glengorm 56-38N 006-08W inoperativecancels · 2002-03-11
- Dsc station glengorm 56-38N 006-08W inoperativereplaced · 2002-03-11
Nearby now · within 120 nm
- Ponta dos meros light 23-13.57S 044-20.83W unlit until 26 sepNav aids · 81.5 nm
- Hazardous operations in progress until 060400Z jun 27 in area bound by 24-39.87S 042-29.30W, 24-39.78S…Exercises · 88 nm
- Odas buoy established in 24-06.36S 045-38.78WNav aids · 88.1 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.