Cable ops
Seismic survey in progress until further notice by M/V cgg fohn towing six 6000 meter long cables in area…
HYDROPAC 1013/07
- issued
- 2007-06-10 10:09Z
- status
- cancelled 2008-02-10 09:15Z (archive)
- authority
- MENAS 39/07 10 JUN 07.
- position
- 26.002, 51.811
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V CGG FOHN TOWING SIX 6000 METER LONG CABLES IN AREA BOUND BY 25-42N 052-20E, 25-32N 052-13E, 26-20N 051-17E, 26-30N 051-20E. WIDE BERTH REQUESTED.
This area · cable & pipeline work
163 within 180 nm since 1999 · 1 in the last 12 months · 1 in force now
99
00
05
10
15
20
25
26
- Pipeline operations 10 aug thru 10 nov by vessel barge derrick barge 30 in area bound by 26-31.70N…2026-08-09
- Cable operations 08 jan until further notice along trackline joining 26-11.18N 050-39.25E, 26-12.03N…2024-01-07
- Pipeline operations in progress thru 31JUL in area bound by 26-10.03N 050-39.57E, 26-10.05N 050-39.72E,…2024-01-05
- Pipeline operations in progress until further notice by M/V DLB-750 along trackline joining 24-47.13N…2023-10-15
- Cable operations in progress until further notice by cableship ccc pioneer along tracklines joining: a.…2023-10-12
- Cable operations in progress until further notice by M/V HALL-1, M/V abs, OCEAN-10 barge, M/V ocean cat and…2023-09-13
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- HYDROPAC messages in force 100800Z feb 2008cancelled by · 2008-02-10
Nearby now · within 120 nm
- Survey operations in progress until 05 sep by M/V furgo proteus in areas bound by: a. 26-33.34N 051-03.56E,…Surveys · 9.2 nm
- Survey operations in progress until further notice by M/V halul 41 in area bound by 26-23.34N 051-47.10E,…Surveys · 10.8 nm
- Pipeline operations 10 aug thru 10 nov by vessel barge derrick barge 30 in area bound by 26-31.70N…Cable ops · 29.2 nm
- Mooring buoy established in 26-38.47N 051-55.82ENav aids · 38.9 nm
- Bh jacket light fl(r) 4 sec temporarily established in 26-38.41N 051-56.90ENav aids · 39 nm
- Wave rider buoy, fl 5 y 10 sec, temporarily established in 26-39.57N 051-57.22ENav aids · 40.2 nm
- Underwater operations in progress until further notice by M/V HYSY289 in area bound by 26-41.99N 051-53.26E,…Surveys · 40.4 nm
- Foul ground, anchor with 2.5 shackle chain reported in 25-07.69N 052-53.09EOther · 78.3 nm
- RACON at dalma buoy 24-32.51N 052-27.85E inoperativeNav aids · 94.6 nm
- Zaqqum buoy in 25-06.56N 053-25.06ENav aids · 102.2 nm
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.