Cable ops
Seismic survey in progress until further notice by M/V pacific sword towing four mile long cable in area…
HYDROPAC 1996/03
- issued
- 2003-11-19 17:00Z
- status
- cancelled 2003-12-01 10:40Z (archive)
- cancels
- HYDROPAC 1994/03HYDROPAC 1944/03
- authority
- AUSCOAST 299/03 191435Z NOV 03; AUSSAR POR EGC#338 191202Z NOV 03
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FOUR MILE LONG CABLE IN AREA BETWEEN 28-30S 30-00S AND 112-30E 114-00E. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1994/03(74,75). 3. CANCEL HYDROPAC 1944/03.
Timeline
- Seismic survey in progress until further notice by M/V pacific sword towing 1.5 mile long cable in area…cancels · 2003-11-10
- Distress signal received on 406 mhz vicinity 36-40S 093-30E at 190734Z novcancels · 2003-11-19
- Seismic survey in progress until further notice by M/V pacific sword towing 1.5 mile long cable in area…replaced · 2003-11-10
- Distress signal received on 406 mhz vicinity 36-40S 093-30E at 190734Z novreplaced · 2003-11-19
- Seismic survey in progress until further notice by M/V pacific sword towing 2.5 mile long cable in area…cancelled by · 2003-12-01
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.