Cable ops
Seismic survey in progress until furtheer notice by M/V geco my towing 3.25 mile long cable in area between…
HYDROPAC 20/99
- issued
- 1999-01-07 09:40Z
- status
- cancelled 1999-01-28 00:00Z (archive)
- cancels
- HYDROPAC 11/99HYDROPAC 742/98
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHEER NOTICE BY M/V GECO MY TOWING 3.25 MILE LONG CABLE IN AREA BETWEEN 10-30S 11-10S AND 127-40E 128-25E. 2. CANCEL HYDROPAC 11/99, AID RESTORED. 3. CANCEL HYDROPAC 742/98.
Timeline
- Seismic survey in progress until further notice by M/V geco towing 3.3 mile long cable in area between…replaced · 1998-09-25
- Point lookout light 27-26S 153-32E unreliablereplaced · 1999-01-04
- Seismic survey in progress until furtheer notice by M/V geco my towing four mile long cable in area between…cancelled by · 1999-01-28
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.