Cable ops
Seismic survey 27 apr thru 27 may by M/V polar duke towing 6000 meter long cable in area between 37-50S…
HYDROPAC 738/04
- issued
- 2004-04-26 09:10Z
- status
- cancelled 2004-05-16 23:28Z (archive)
- cancels
- HYDROPAC 737/04
- authority
- NAVAREA XIV 26/04 252246Z APR 04
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY 27 APR THRU 27 MAY BY M/V POLAR DUKE TOWING 6000 METER LONG CABLE IN AREA BETWEEN 37-50S 38-44S AND 173-54E 174-39E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 737/04. 3. CANCEL THIS MSG 28 MAY.
Timeline
- Seismic survey in progress until further notice by M/V polar duke towing 6000 meter long cable in area bound…cancels · 2004-04-25
- Seismic survey in progress until further notice by M/V polar duke towing 6000 meter long cable in area bound…replaced · 2004-04-25
- Seismic survey in progress until 26 may by M/V polar duke towing 5000 meter long cable in area between…cancelled by · 2004-05-16
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.