Cable ops
Seismic survey 080300Z to 120259Z jun by M/V western neptune towing 12 3.5 mile long cables and M/V geco…
Brazil-southeast Coast · HYDROLANT 1049/10
- issued
- 2010-06-08 01:19Z
- status
- cancelled 2010-06-12 03:59Z (archive)
- self-cancels
- 2010-06-12 03:59Z
- authority
- NAVAREA V E 894/10 080033Z JUN 10.
- sea
- South Atlantic Ocean
- position
- -22.778, -40.851
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-SOUTHEAST COAST. 1. SEISMIC SURVEY 080300Z TO 120259Z JUN BY M/V WESTERN NEPTUNE TOWING 12 3.5 MILE LONG CABLES AND M/V GECO DIAMOND TOWING 250 METER LONG CABLE IN AREA BOUND BY 23-00.67S 040-50.80W, 22-58.85S 040-51.62W, 23-00.60S 040-55.90W, 22-52.20S 041-10.90W, 22-35.00S 041-00.70W, 22-30.13S 040-45.62W, 22-37.22S 040-42.47W, 22-36.05S 040-39.35W, 22-53.30S 040-31.75W. SIX MILE BERTH REQUESTED. 2. CANCEL THIS MSG 120359Z JUN.
Activity windows · 1 in this warning
| opens (UTC) | closes (UTC) | local | length |
|---|---|---|---|
| 2010-06-08 03:00Z | 2010-06-12 02:59Z | — | 95 h 59 |
Parsed from the warning text; outside these windows the area is normally not active, but the warning stays in force until cancelled.
This area · cable & pipeline work
1973 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
21
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Seismic survey 21 thru 28 jan by oceanic champion towing 12 8000 meter long cables in area bound by…2017-01-19
- Seismic survey 14 thru 21 jan by oceanic champion towing 12 8000 meter cables in area bound by 25-33.47S…2017-01-10
- Seismic survey in progress until 14 jan by oceanic champion towing 12 8000 meter cables in area bound by…2017-01-07
- Seismic survey 31 dec thru 07 jan 17 by M/V oceanic champion towing 12 7408 meter long cables in area bound…2016-12-30
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 13.2 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 31.3 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 34.1 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 45.6 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 49.1 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 52.3 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 54.9 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 56.5 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 59.2 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 72.9 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 88.2 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.