Cable ops
Pipe laying operations 081100Z to 142100Z sep by M/V polar bjorn vicinity 23-56S 045-55W
HYDROLANT 1435/08
- issued
- 2008-09-06 04:57Z
- status
- cancelled 2008-09-14 22:00Z (archive)
- self-cancels
- 2008-09-14 22:00Z
- cancels
- HYDROLANT 1350/08HYDROLANT 1351/08
- authority
- NAVAREA V S 239/08 060045Z SEP 08.
- sea
- South Atlantic Ocean
- position
- -23.933, -45.917
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. PIPE LAYING OPERATIONS 081100Z TO 142100Z SEP BY M/V POLAR BJORN VICINITY 23-56S 045-55W. TWO MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 1350/08 AND 1351/08. 3. CANCEL THIS MSG 142200Z SEP.
Activity windows · 1 in this warning
| opens (UTC) | closes (UTC) | local | length |
|---|---|---|---|
| 2008-09-08 11:00Z | 2008-09-14 21:00Z | — | 154 h |
Parsed from the warning text; outside these windows the area is normally not active, but the warning stays in force until cancelled.
This area · cable & pipeline work
1048 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
23
- Cable operations in progress until 30 mar 24 by cableship durable in: a. 24-05.68S 046-30.76W2023-12-27
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Underwater operations in progress until 142359Z aug by cableship ile de brehat in: a. 24-03.0S 046-31.4W2017-07-14
- Underwater operations in progress until 132300Z jul by cableship ile de brehat in: a. 24-03.8S 046-29.2W2017-06-15
- Seismic survey 21 thru 28 jan by M/V polarcus adira towing 9000 meter long cable in area bound by 25-06S…2017-01-19
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Pipe laying operations 190300Z aug T0 150300Z oct by barge acergy piper along trackline between 23-49.9S…cancels · 2008-08-19
- Pipe laying operations 211100Z aug to 222100Z sep by M/V polar bjorn along trackline joining 23-49.42S…cancels · 2008-08-19
- Pipe laying operations 190300Z aug T0 150300Z oct by barge acergy piper along trackline between 23-49.9S…replaced · 2008-08-19
- Pipe laying operations 211100Z aug to 222100Z sep by M/V polar bjorn along trackline joining 23-49.42S…replaced · 2008-08-19
Nearby now · within 120 nm
- Odas buoy established in 24-06.36S 045-38.78WNav aids · 18.1 nm
- Laje da conceicao light 24-14.18S 046-41.46W unlit until 24 sepNav aids · 46.2 nm
- Ponta dos meros light 23-13.57S 044-20.83W unlit until 26 sepNav aids · 96.2 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.