Cable ops
Seismic survey in progress until 060300Z aug by M/V bulldog towing 15 meter long cable in area bound by…
HYDROLANT 1452/03
- issued
- 2003-07-29 08:45Z
- status
- cancelled 2003-08-06 04:00Z (archive)
- self-cancels
- 2003-08-06 04:00Z
- cancels
- HYDROLANT 1429/03
- authority
- NAVAREA V 894/03 290405Z JUL 03
- sea
- South Atlantic Ocean
- position
- -4.674, -37.304
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 060300Z AUG BY M/V BULLDOG TOWING 15 METER LONG CABLE IN AREA BOUND BY 04-40.1S 037-23.2W, 04-35.5S 037-20.2W, 04-40.8S 037-13.2W, 04-45.4S 037-16.3W. ONE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 1429/03. 3. CANCEL THIS MSG 060400Z AUG.
This area · cable & pipeline work
343 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Seismic survey 19 thru 27 jan by M/V bgp challenger towing 10000 meter long cable in area bound by 04-09S…2017-01-18
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-10-10
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 1400 meter long cables in area…2015-09-16
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.