Cable ops
Seismic survey in progress until 260259Z aug by M/V ramform challenger towing ten 6000 meter long cables in…
HYDROLANT 1494/06
- issued
- 2006-08-16 06:40Z
- status
- cancelled 2006-08-23 03:27Z (archive)
- self-cancels
- 2006-08-26 03:59Z
- cancels
- HYDROLANT 1351/06
- authority
- NAVAREA V 499/06, 501/06 160411Z AUG 06.
- sea
- South Atlantic Ocean
- position
- -24.378, -43.764
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 260259Z AUG BY M/V RAMFORM CHALLENGER TOWING TEN 6000 METER LONG CABLES IN AREA BOUND BY 24-00S 043-26W, 24-26S 043-15W, 24-45S 044-06W, 24-20S 044-17W. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 1351/06. 3. CANCEL THIS MSG 260359Z AUG.
This area · cable & pipeline work
1910 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
23
- Cable operations in progress until 30 mar 24 by cableship durable in: a. 24-05.68S 046-30.76W2023-12-27
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Seismic survey in progress until 09 oct by M/V sw diamond towing nine 225 meter long cables in area bound by…2022-10-07
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Underwater operations in progress until 142359Z aug by cableship ile de brehat in: a. 24-03.0S 046-31.4W2017-07-14
- Underwater operations in progress until 132300Z jul by cableship ile de brehat in: a. 24-03.8S 046-29.2W2017-06-15
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Ponta do retiro light 21-21.56S 040-57.76W unlitcancels · 2006-07-18
- Ponta do retiro light 21-21.56S 040-57.76W unlitreplaced · 2006-07-18
- Seismic survey in progress until 260259Z aug by M/V cgg alize towing ten 6000 meter long cables along…cancelled by · 2006-08-23
Nearby now · within 120 nm
- Hazardous operations in progress until 060400Z jun 27 in area bound by 24-39.87S 042-29.30W, 24-39.78S…Exercises · 70.6 nm
- Ponta dos meros light 23-13.57S 044-20.83W unlit until 26 sepNav aids · 76.2 nm
- Odas buoy established in 24-06.36S 045-38.78WNav aids · 104.3 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.