Cable ops
Seismic survey in progress until 18 aug by M/V toisa vigilante towing two mile long cable in area bound by…
HYDROLANT 1541/09
- issued
- 2009-08-15 00:41Z
- status
- cancelled 2009-08-19 00:01Z (archive)
- authority
- NAVAREA V N 1680/09 150028Z AUG 09.
- sea
- South Atlantic Ocean
- position
- -3.704, -37.487
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 18 AUG BY M/V TOISA VIGILANTE TOWING TWO MILE LONG CABLE IN AREA BOUND BY 03-27S 037-49W, 04-03S 037-15W, 03-58S 037-09W, 03-21S 037-44W. THREE MILE BERTH REQUESTED. 2. CANCEL THIS MSG 19 AUG.
This area · cable & pipeline work
358 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Underwater operations 1000Z to 2000Z daily 10 may thru 20 sep by cableship recorder and M/V saga badejo in…2018-08-10
- Underwater operations 1000Z to 2000Z daily 10 may thru 09 aug by cableship recorder and M/V saga badejo in…2018-05-10
- Seismic survey 19 thru 27 jan by M/V bgp challenger towing 10000 meter long cable in area bound by 04-09S…2017-01-18
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.