Cable ops
Seismic survey in progress until further notice by M/V ramform viking towing ten 6500 meter long cables in…
HYDROLANT 1646/08
- issued
- 2008-10-06 11:45Z
- status
- cancelled 2008-10-23 17:25Z (archive)
- cancels
- HYDROLANT 1610/08
- authority
- NAVAREA III 415/08 061056Z OCT 0
- sea
- Mediterranean Sea - Eastern Basin
- position
- 32.007, 31.693
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V RAMFORM VIKING TOWING TEN 6500 METER LONG CABLES IN AREA BOUND BY 31-32.54N 032-44.54E, 31-32.54N 030-55.54E, 32-37.54N 030-55.54E, 32-37.54N 031-56.04E, 32-05.54N 031-56.04E, 32-05.54N 032-44.54E. WIDE BERTH REQUESTED. 2. CANCEL HYDROLANT 1610/08(55) AND 1624/08.
This area · cable & pipeline work
233 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
22
- Cable operations in progress until 20 oct by cableship ile de batz along trackline joining 29-49.00N…2022-09-15
- Cable operations 01 thru 04 sep in area bound by 34-47N 032-19E, 34-42N 032-33E, 34-22N 032-24E, 34-26N…2021-08-30
- Cable operations 24 thru 27, 30 and 31 aug by M/V bold maverick in areas bound by: a. 34-47.00N 032-19.00E,…2021-08-21
- Cable operations 151600Z to 202359Z mar by cableship raymond croze in area within three miles of 31-13.2N…2021-03-14
- Cable operations in progress until 22 oct by cableship ile d'ouessant in area bound by 33-49.11N 030-52.08E,…2020-10-12
- Cable operations in progress until 15 oct by cableship ile d'ouessant in area bound by 33-49.11N 030-52.08E,…2020-09-28
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Cable repair operations in progress until further notice by M/V raimond croze in 43-56.6N 031-25.5Ecancels · 2008-09-30
- Cable repair operations in progress until further notice by M/V raimond croze in 43-56.6N 031-25.5Ereplaced · 2008-09-30
- Seismic survey in progress until further notice by M/V ramform viking towing ten 6500 meter long cables in…replaced · 2008-10-02
- Seismic survey in progress until 23 nov by M/V ramform viking, M/V romolos, M/V mary fredy, M/V embrge, M/V…cancelled by · 2008-10-23
Nearby now · within 120 nm
- Odas buoy 33-33.41N 031-55.09E reported missingNav aids · 93.8 nm
- NAVTEX station alexandria (n) 31-11.92N 029-51.86E off airNav aids · 105.3 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.