Cable ops

Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 05 aug along trackline between…

Western South Atlantic · Uruguay · HYDROLANT 1901/13

issued
2013-08-05 11:31Z
status
cancelled 2013-08-07 00:01Z (archive)
cancels
HYDROLANT 1895/13
authority
NAVAREA VI 349/13 05 AUG 13.
sea
South Atlantic Ocean
position
-34.983, -51.887
source
nga_json · first seen 2026-08-17 13:38Z

Original warning text

WESTERN SOUTH ATLANTIC.
URUGUAY.
1. SEISMIC SURVEY BY M/V RAMFORM VANGUARD TOWING 12
   7000 METER LONG CABLES:
   A. 05 AUG ALONG TRACKLINE BETWEEN
      35-00.18S 052-09.92W AND 35-06.77S 051-59.68W.
   B. 05 AUG ALONG TRACKLINE BETWEEN
      35-09.65S 051-54.55W AND 35-12.68S 051-49.80W.
   C. 05 AUG ALONG TRACKLINE BETWEEN
      35-10.47S 051-40.38W AND 35-03.55S 051-51.20W.
   D. 05 AUG ALONG TRACKLINE BETWEEN
      34-58.38S 051-59.28W AND 34-57.93S 051-59.97W.
   E. 05 AUG ALONG TRACKLINE BETWEEN
      34-55.93S 052-04.37W AND 34-49.22S 052-14.77W.
   F. 05 AUG ALONG TRACKLINE BETWEEN
      34-42.27S 052-21.03W AND 34-41.52S 052-22.18W.
   G. 06 AUG ALONG TRACKLINE BETWEEN
      34-37.78S 052-19.67W AND 35-16.77S 051-18.80W.
   NINE MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 1895/13.
3. CANCEL THIS MSG 07 AUG 13.

This area · cable & pipeline work

506 within 180 nm since 2000 · 0 in the last 12 months · 0 in force now

00
05
10
15
20

Season · when cable & pipeline work happen here

J
F
M
A
M
J
J
A
S
O
N
D

month of issue, all years in the archive

Timeline

Nearby now · within 120 nm

Worldwide now

40 cable & pipeline work in force · see all

Cable ops

Cable laying, pipeline and seismic operations. All current cable & pipeline work

Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.