Cable ops
Seismic survey in progress until 250259Z dec by vessel in area bound by 03-47.13S 038-33.00W, 03-42.10S…
HYDROLANT 2033/04
- issued
- 2004-12-21 06:44Z
- status
- cancelled 2004-12-25 03:59Z (archive)
- self-cancels
- 2004-12-25 03:59Z
- authority
- NAVAREA V 976/04 21 DEC 04.
- sea
- South Atlantic Ocean
- position
- -3.534, -38.538
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 250259Z DEC BY VESSEL IN AREA BOUND BY 03-47.13S 038-33.00W, 03-42.10S 038-16.00W, 03-06.80S 038-47.80W. WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 250359Z DEC.
This area · cable & pipeline work
354 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-10-10
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 1400 meter long cables in area…2015-09-16
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-09-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.