Cable ops
Seismic survey 141200Z aug to 052300Z sep by M/V ramform atlas towing 12 11000 meter long cables in area…
Eastern North Atlantic · Morocco · HYDROLANT 2058/16
- issued
- 2016-08-14 07:20Z
- status
- cancelled 2016-09-06 00:01Z (archive)
- self-cancels
- 2016-09-06 00:01Z
- cancels
- HYDROLANT 2033/16
- authority
- NAVAREA II 240/16 140402Z AUG 16.
- sea
- North Atlantic Ocean
- position
- 34.744, -7.411
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
EASTERN NORTH ATLANTIC. MOROCCO. DNC 08. 1. SEISMIC SURVEY 141200Z AUG TO 052300Z SEP BY M/V RAMFORM ATLAS TOWING 12 11000 METER LONG CABLES IN AREA BOUND BY 35-05N 007-47W, 34-43N 006-51W, 34-24N 007-02W, 34-47N 007-59W. SEVEN MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 2033/16. 3. CANCEL THIS MSG 060001Z SEP 16.
Activity windows · 1 in this warning
| opens (UTC) | closes (UTC) | local | length |
|---|---|---|---|
| 2016-08-14 12:00Z | 2016-09-05 23:00Z | — | 539 h |
Parsed from the warning text; outside these windows the area is normally not active, but the warning stays in force until cancelled.
This area · cable & pipeline work
182 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
24
- Pipeline operations in progress until further notice by M/V edda flora along trackline joining 36-00.40N…2024-02-10
- Pipeline operations 08 feb until further notice by M/V edda flora with submersible in area bound by…2024-02-05
- Pipeline operations in progress until further notice by M/V edda flora along trackline joining 35-51.50N…2024-01-16
- Pipeline operations in progress until further notice by M/V edda flora along trackline joining 35-45.10N…2024-01-15
- Pipeline operations in progress until further notice by M/V edda flora along trackline joining 36-05.35N…2024-01-12
- Pipeline operations 08 jan until further notice by M/V edda flora along trackline joining 36-00.20N…2024-01-05
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until 15 aug by M/V ramform atlas towing 11000 meter long cables in area bound by…cancels · 2016-08-10
- Seismic survey in progress until 15 aug by M/V ramform atlas towing 11000 meter long cables in area bound by…replaced · 2016-08-10
- Seismic survey in progress until 060100Z sep by M/V ramform atlas towing 12 11000 meter long cables in area…cancelled by · 2016-09-02
Nearby now · within 120 nm
- El hank light 33-36.60N 007-39.28W unlitNav aids · 69.2 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.