Cable ops
Seismic survey in progress until 202359Z apr 09 by M/V polar queen in area bound by 21-51S 039-43W, 22-51S…
HYDROLANT 2142/08
- issued
- 2008-12-13 02:17Z
- status
- cancelled 2009-01-30 16:50Z (archive)
- self-cancels
- 2009-04-21 00:59Z
- cancels
- HYDROLANT 2136/08
- authority
- NAVAREA V E 1002/08 130036Z DEC 08.
- sea
- South Atlantic Ocean
- position
- -22.303, -39.925
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 202359Z APR 09 BY M/V POLAR QUEEN IN AREA BOUND BY 21-51S 039-43W, 22-51S 039-54W, 22-07S 040-09W, 22-09S 040-06W, 21-59S 039-56W, 21-59S 039-44W. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 2136/08. 3. CANCEL THIS MSG 210059Z APR 09.
This area · cable & pipeline work
1633 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
21
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Seismic survey in progress until 15 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-08
- Seismic survey in progress until 08 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-01
- Seismic survey 17 thru 24 sep by M/V bgp challenger towing 12000 meter long cable in area bound by 25-07S…2016-09-16
- Brazil-southeast coast DNC 012016-08-11
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until 20 apr 09 by M/V polar queen in area bound by 21-51S 039-43W, 22-51S…cancels · 2008-12-12
- Seismic survey in progress until 20 apr 09 by M/V polar queen in area bound by 21-51S 039-43W, 22-51S…replaced · 2008-12-12
- Pipelaying operations 01 feb thru 31 dec by M/V acergy polaris, M/V legend, M/V hawk and M/V polar queen in…cancelled by · 2009-01-30
Nearby now · within 120 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 5.9 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 27.7 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 28.6 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 37.7 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 52 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 53.6 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 56.8 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 62.7 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 64.6 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 71.6 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 83 nm
- Underwater operations 1100Z to 2100Z daily 13 thru 22 aug by M/V comando b and M/V am kirti in 20-23.90S…Surveys · 115.1 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.