Cable ops
Seismic survey in progress until 050259Z dec by M/V cgg alize towing ten 6000 meter long cables in area…
HYDROLANT 2152/06
- issued
- 2006-12-02 08:08Z
- status
- cancelled 2006-12-05 03:59Z (archive)
- self-cancels
- 2006-12-05 03:59Z
- cancels
- HYDROLANT 2145/06
- authority
- NAVAREA V 854/06,853/06 020358Z DEC 06.
- sea
- South Atlantic Ocean
- position
- -23.450, -40.825
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 050259Z DEC BY M/V CGG ALIZE TOWING TEN 6000 METER LONG CABLES IN AREA BOUND BY 24-20S 041-26W, 22-40S 041-26W, 22-40S 041-11W, 21-53S 040-29W, 22-07S 040-13W, 22-48S 040-52W, 24-20S 039-48W. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 2145/06. 3. CANCEL THIS MSG 050359Z DEC.
This area · cable & pipeline work
2159 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
23
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Seismic survey in progress until 09 oct by M/V sw diamond towing nine 225 meter long cables in area bound by…2022-10-07
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Underwater operations in progress until 132300Z jul by cableship ile de brehat in: a. 24-03.8S 046-29.2W2017-06-15
- Seismic survey 21 thru 28 jan by oceanic champion towing 12 8000 meter long cables in area bound by…2017-01-19
- Seismic survey 14 thru 21 jan by oceanic champion towing 12 8000 meter cables in area bound by 25-33.47S…2017-01-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 39.7 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 64.4 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 65.3 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 68.4 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 83.3 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 85.4 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 89.3 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 92.4 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 96.8 nm
- Hazardous operations 0800Z to 2100Z daily 18 thru 20 aug in area within ten miles of 25-06.00S 041-13.00WExercises · 101.4 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 113 nm
- Hazardous operations in progress until 060400Z jun 27 in area bound by 24-39.87S 042-29.30W, 24-39.78S…Exercises · 117 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.