Cable ops
Seismic survey in progress until 270259Z nov by M/V geo angler towing 3500 meter long cable in area bound by…
HYDROLANT 2162/05
- issued
- 2005-11-23 06:22Z
- status
- cancelled 2005-11-27 03:59Z (archive)
- self-cancels
- 2005-11-27 03:59Z
- cancels
- HYDROLANT 2161/05HYDROLANT 2150/05
- authority
- NAVAREA V 947/05 230407Z NOV 05; WZ 1740/05 230248Z NOV 05.
- sea
- South Atlantic Ocean
- position
- -21.557, -39.807
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 270259Z NOV BY M/V GEO ANGLER TOWING 3500 METER LONG CABLE IN AREA BOUND BY 21-11.0S 040-09.6W, 21-15.1S 039-28.1W, 21-53.3S 039-25.0W, 21-53.3S 040-09.6W. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 2161/05(37). 3. CANCEL HYDROLANT 2150/05. 4. CANCEL THIS MSG 270359Z NOV.
This area · cable & pipeline work
1450 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
21
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Brazil-southeast coast DNC 012016-08-11
- Seismic survey in progress until 23 apr by nps sigma in area bound by 21-10.6S 039-55.5W, 21-10.5S…2016-04-12
- Seismic survey 10 thru 16 apr by nps sigma in area bound by 21-19.4S 039-57.5W, 21-17.3S 039-57.5W, 21-11.2S…2016-04-09
- Seismic survey in progress until 09 apr by M/V nps sigma in area bound by 21-00.6S 039-44.0W, 21-11.4S…2016-04-01
- Seismic survey 26 mar thru 02 apr by M/V nps sigma in area bound by 21-00.6S 039-44.0W, 21-11.4S 039-39.3W,…2016-03-27
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until 270259Z nov by M/V geo angler towing 3500 meter long cable in area between…cancels · 2005-11-22
- Dsc station berry head 50-24N 003-29W inoperativecancels · 2005-11-22
- Seismic survey in progress until 270259Z nov by M/V geo angler towing 3500 meter long cable in area between…replaced · 2005-11-22
- Dsc station berry head 50-24N 003-29W inoperativereplaced · 2005-11-22
Nearby now · within 120 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 44.7 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 51.4 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 57.2 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 58.6 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 59.7 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 61.3 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 63.2 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 66.3 nm
- Underwater operations 1100Z to 2100Z daily 13 thru 22 aug by M/V comando b and M/V am kirti in 20-23.90S…Surveys · 72.3 nm
- Underwater operations 0800Z to 1800Z daily 08 thru 22 aug by M/V marsanne and M/V comando b in 20-23.57S…Surveys · 72.4 nm
- Underwater operations 1100Z to 2100Z daily 12 thru 21 aug by M/V comando b and M/V faneromeni in 20-23.67S…Surveys · 72.5 nm
- Underwater operations 0800Z to 1800Z daily 11 thru 25 aug by M/V comando b and M/V faneromeni in 20-23.00S…Surveys · 73 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.