Cable ops
Seismic survey in progress until 220259Z dec by M/V cgg alize towing ten 6000 meter long cables in area…
HYDROLANT 2214/06
- issued
- 2006-12-11 05:53Z
- status
- cancelled 2006-12-11 15:37Z (archive)
- self-cancels
- 2006-12-22 03:59Z
- cancels
- HYDROLANT 2205/06
- authority
- NAVAREA V 874/06 110403Z DEC 06.
- sea
- South Atlantic Ocean
- position
- -23.026, -40.856
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 220259Z DEC BY M/V CGG ALIZE TOWING TEN 6000 METER LONG CABLES IN AREA BOUND BY 23-45S 041-20W, 22-40S 041-20W, 22-40S 041-11W, 21-53S 040-29W, 22-07S 040-13W, 22-48S 040-52W, 23-45S 040-13W. WIDE BERTH REQUESTED. 2. CANCEL HYDROLANT 2205/06. 3. CANCEL THIS MSG 220359Z DEC.
This area · cable & pipeline work
2063 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
23
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Seismic survey 21 thru 28 jan by oceanic champion towing 12 8000 meter long cables in area bound by…2017-01-19
- Seismic survey 14 thru 21 jan by oceanic champion towing 12 8000 meter cables in area bound by 25-33.47S…2017-01-10
- Seismic survey in progress until 14 jan by oceanic champion towing 12 8000 meter cables in area bound by…2017-01-07
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until 160259Z dec by M/V cgg alize towing ten 6000 meter long cables in area…cancels · 2006-12-09
- Seismic survey in progress until 160259Z dec by M/V cgg alize towing ten 6000 meter long cables in area…replaced · 2006-12-09
- Seismic survey in progress until 11 jan 07 by M/V bul doog in area bound by 31-48N 030-31E, 31-48N 030-08E,…cancelled by · 2006-12-11
Nearby now · within 120 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 17.1 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 42.5 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 46 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 59.2 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 60.1 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 63.9 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 64.4 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 67.1 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 71.4 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 87.7 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 103 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.