Cable ops
Seismic survey in progress until 180300Z dec by M/V ramform viking towing eight 6000 meter long cables in…
HYDROLANT 2311/03
- issued
- 2003-12-12 15:15Z
- status
- cancelled 2003-12-18 04:00Z (archive)
- self-cancels
- 2003-12-18 04:00Z
- cancels
- HYDROLANT 2265/03HYDROLANT 2308/03
- authority
- NAVAREA V 1419/03 121234Z DEC 03; WZ 1622/03 120712Z DEC 03; COGARD NAVCEN 121125Z DEC 03
- sea
- South Atlantic Ocean
- position
- -3.060, -38.522
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 180300Z DEC BY M/V RAMFORM VIKING TOWING EIGHT 6000 METER LONG CABLES IN AREA BOUND BY 02-50S 038-27W, 02-53S 038-23W, 03-16S 038-34W, 03-13S 038-40W. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 2265/03(36), OPERATIONS COMPLETED. 3. CANCEL HYDROLANT 2308/03(GEN). 4. CANCEL THIS MSG 180400Z DEC.
This area · cable & pipeline work
355 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-10-10
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 1400 meter long cables in area…2015-09-16
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-09-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Underwater operations in progress until further notice by cableship sovereign vicinity 50-47N 005-11Wcancels · 2003-12-04
- Prn 26 unusablecancels · 2003-12-12
- Underwater operations in progress until further notice by cableship sovereign vicinity 50-47N 005-11Wreplaced · 2003-12-04
- Prn 26 unusablereplaced · 2003-12-12
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.