Cable ops
Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 20 oct along trackline between…
Western South Atlantic · Uruguay · HYDROLANT 2618/13
- issued
- 2013-10-20 16:09Z
- status
- cancelled 2013-10-22 00:01Z (archive)
- cancels
- HYDROLANT 2607/13HYDROLANT 2601/13
- authority
- NAVAREA VI 455/13 20Z OCT 13 - WZ 1164/13 201543Z OCT 13.
- sea
- South Atlantic Ocean
- position
- -35.509, -52.775
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
WESTERN SOUTH ATLANTIC.
URUGUAY.
1. SEISMIC SURVEY BY M/V RAMFORM VANGUARD TOWING 12
7000 METER LONG CABLES:
A. 20 OCT ALONG TRACKLINE BETWEEN
35-42.95S 053-04.46W AND 35-28.35S 052-49.78W.
B. 20 OCT ALONG TRACKLINE BETWEEN
35-19.07S 052-40.98W AND 35-07.85S 052-29.83W.
C. 21 OCT ALONG TRACKLINE BETWEEN
35-13.15S 052-25.40W AND 35-53.63S 053-05.98W.
NINE MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 2607/13(35), AID RESTORED.
3. CANCEL HYDROLANT 2601/13.
4. CANCEL THIS MSG 22 OCT 13.
This area · cable & pipeline work
496 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-35.59S…2020-09-23
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-35.59S…2020-09-18
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 35-54.40S…2020-09-02
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-19.61S…2020-08-23
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-28
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-16
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 19 oct along trackline between…cancels · 2013-10-19
- Scotland-east Coastcancels · 2013-10-19
- Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 19 oct along trackline between…replaced · 2013-10-19
- Scotland-east Coastreplaced · 2013-10-19
Nearby now · within 120 nm
- Radiobeacon at chui light 33-44.6S 053-22.5W off air until 17 jan 27Nav aids · 110.1 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.