Cable ops
Seismic survey in progress by M/V hawk explorer towing 5.4 mile long cables: a. in progress along trackline…
Brazil-north Coast · HYDROLANT 2798/12
- issued
- 2012-11-28 00:54Z
- status
- cancelled 2012-12-03 00:01Z (archive)
- authority
- NAVAREA V N 1610/12 280028Z NOV 12.
- sea
- South Atlantic Ocean
- position
- -3.355, -37.376
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-NORTH COAST.
1. SEISMIC SURVEY IN PROGRESS BY M/V HAWK EXPLORER
TOWING 5.4 MILE LONG CABLES:
A. IN PROGRESS ALONG TRACKLINE BETWEEN
02-50.69S 037-12.78W AND 03-37.73S 037-48.97W.
B. 29 NOV ALONG TRACKLINE BETWEEN
02-54.01S 037-08.51W AND 03-41.32S 037-44.91W.
C. 30 NOV ALONG TRACKLINE BETWEEN
02-57.33S 037-04.24W AND 03-45.06S 037-40.96W.
D. 01 DEC ALONG TRACKLINE BETWEEN
03-00.65S 036-59.97W AND 03-48.96S 037-37.13W.
E. 02 DEC ALONG TRACKLINE BETWEEN
03-03.96S 036-55.70W AND 03-52.86S 037-33.30W.
SEVEN MILE BERTH REQUESTED.
2. CANCEL THIS MSG 03 DEC 12.
This area · cable & pipeline work
360 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Underwater operations 1000Z to 2000Z daily 10 may thru 20 sep by cableship recorder and M/V saga badejo in…2018-08-10
- Underwater operations 1000Z to 2000Z daily 10 may thru 09 aug by cableship recorder and M/V saga badejo in…2018-05-10
- Seismic survey 19 thru 27 jan by M/V bgp challenger towing 10000 meter long cable in area bound by 04-09S…2017-01-18
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.