Cable ops
Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 16 nov along trackline between…
Western South Atlantic · Uruguay · HYDROLANT 2897/13
- issued
- 2013-11-16 14:43Z
- status
- cancelled 2013-11-17 17:43Z (archive)
- cancels
- HYDROLANT 2880/13
- authority
- NAVAREA VI 513/13 161414Z NOV 13.
- sea
- South Atlantic Ocean
- position
- -35.770, -52.709
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
WESTERN SOUTH ATLANTIC.
URUGUAY.
1. SEISMIC SURVEY BY M/V RAMFORM VANGUARD TOWING 12
7000 METER LONG CABLES:
A. 16 NOV ALONG TRACKLINE BETWEEN
35-34.98S 052-28.17W AND 36-13.60S 053-06.07W.
B. 16 AND 17 NOV ALONG TRACKLINE BETWEEN
36-01.37S 053-04.52W AND 35-15.28S 052-18.42W.
C. 17 AND 18 NOV ALONG TRACKLINE BETWEEN
35-20.58S 052-13.51W AND 36-13.80S 053-06.70W.
NINE MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 2880/13.
3. CANCEL THIS MSG 19 NOV 13.
This area · cable & pipeline work
497 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-35.59S…2020-09-23
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-35.59S…2020-09-18
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 35-54.40S…2020-09-02
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-19.61S…2020-08-23
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-28
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-16
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 15 nov along trackline between…cancels · 2013-11-15
- Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 15 nov along trackline between…replaced · 2013-11-15
- Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 17 nov along trackline between…cancelled by · 2013-11-17
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.