Cable ops
Seismic survey in progress until 100159Z feb by M/V veritas viking I towing six 6000 meter long cables in…
HYDROLANT 291/02
- issued
- 2002-02-05 06:10Z
- status
- cancelled 2002-02-10 02:59Z (archive)
- self-cancels
- 2002-02-10 02:59Z
- cancels
- HYDROLANT 241/02HYDROLANT 258/02
- authority
- NAVAREA V 149/02; NAVAREA V 150/02 050402Z FEB 02
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 100159Z FEB BY M/V VERITAS VIKING I TOWING SIX 6000 METER LONG CABLES IN AREA BETWEEN 25-35.5S 25-41.5S AND 042-27.1W 044-32.1W. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 241/02 AND 258/02. 3. CANCEL THIS MSG 100259Z FEB.
Timeline
- 500 meter long pipe adrift in 24-03S 039-38W at 311730Z jancancels · 2002-01-31
- Seismic survey in progress until 060159Z feb by M/V veritas viking I towing six 6000 meter long cables in…cancels · 2002-02-02
- 500 meter long pipe adrift in 24-03S 039-38W at 311730Z janreplaced · 2002-01-31
- Seismic survey in progress until 060159Z feb by M/V veritas viking I towing six 6000 meter long cables in…replaced · 2002-02-02
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.