Cable ops
Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 21 nov along trackline between…
Western South Atlantic · Uruguay · HYDROLANT 2959/13
- issued
- 2013-11-21 14:38Z
- status
- cancelled 2013-11-22 02:26Z (archive)
- cancels
- HYDROLANT 2765/13HYDROLANT 2944/13
- authority
- NAVAREA VI 524/13 211400Z NOV 13 - NAVAREA III 582/13 211233Z NOV 13.
- sea
- South Atlantic Ocean
- position
- -35.711, -52.682
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
WESTERN SOUTH ATLANTIC.
URUGUAY.
1. SEISMIC SURVEY BY M/V RAMFORM VANGUARD TOWING 12
7000 METER LONG CABLES:
A. 21 NOV ALONG TRACKLINE BETWEEN
35-20.57S 052-13.88W AND 36-13.68S 053-07.18W.
B. 21 NOV ALONG TRACKLINE BETWEEN
36-00.87S 053-04.52W AND 35-15.08S 052-18.65W.
C. 21 AND 22 NOV ALONG TRACKLINE BETWEEN
35-20.57S 052-13.88W AND 36-12.57S 053-06.05W.
D. 22 AND 23 NOV ALONG TRACKLINE BETWEEN
36-00.35S 053-04.52W AND 35-14.88S 052-18.88W.
NINE MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 2765/13(56).
3. CANCEL HYDROLANT 2944/13.
4. CANCEL THIS MSG 24 NOV 13.
This area · cable & pipeline work
497 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-35.59S…2020-09-23
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-35.59S…2020-09-18
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 35-54.40S…2020-09-02
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-19.61S…2020-08-23
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-28
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-16
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Geophysical survey in progress until 01 jan 14 by M/V ocean observer in area bound by 33-30.0N 031-55.0E,…cancels · 2013-11-04
- Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 19 and 20 nov along trackline…cancels · 2013-11-20
- Geophysical survey in progress until 01 jan 14 by M/V ocean observer in area bound by 33-30.0N 031-55.0E,…replaced · 2013-11-04
- Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 19 and 20 nov along trackline…replaced · 2013-11-20
- Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 22 nov along trackline between…cancelled by · 2013-11-22
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.