Cable ops
Seismic survey in progress until 01 sep by M/V geco tau towing 8300 meter long cable in area bound by 02-43S…
HYDROLANT 3017/00
- issued
- 2000-08-30 21:35Z
- status
- cancelled 2000-09-01 06:35Z (archive)
- authority
- NAVAREA V 1896/00 302044Z AUG 00
- sea
- South Atlantic Ocean
- position
- -2.984, -38.644
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 01 SEP BY M/V GECO TAU TOWING 8300 METER LONG CABLE IN AREA BOUND BY 02-43S 038-48W, 02-07S 039-14W, 03-30S 038-23W, 03-26S 038-20W, 02-56S 038-34W. SIX MILE BERTH REQUESTED. 2. CANCEL THIS MSG 02 SEP.
This area · cable & pipeline work
354 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-10-10
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 1400 meter long cables in area…2015-09-16
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-09-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.