Cable ops
Cable laying operations in progress until 04 sep by cableship heimdal along trackline between 03-44S 038-26W…
HYDROLANT 3046/00
- issued
- 2000-09-02 06:45Z
- status
- cancelled 2000-09-05 00:00Z (archive)
- cancels
- HYDROLANT 3014/00
- authority
- NAVAREA V 1919/00 020434Z SEP 00
- sea
- South Atlantic Ocean
- position
- -3.800, -38.367
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. CABLE LAYING OPERATIONS IN PROGRESS UNTIL 04 SEP BY CABLESHIP HEIMDAL ALONG TRACKLINE BETWEEN 03-44S 038-26W AND 03-52S 038-18W. ONE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 3014/00. 3. CANCEL THIS MSG 05 SEP.
This area · cable & pipeline work
355 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-10-10
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 1400 meter long cables in area…2015-09-16
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-09-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.