Cable ops
Seismic survey in progress until 22 sep by M/V ramform vanguard and M/V kondor explorer towing ten 4800…
HYDROLANT 3244/00
- issued
- 2000-09-20 06:10Z
- status
- cancelled 2000-09-23 00:00Z (archive)
- cancels
- HYDROLANT 3088/00
- authority
- NAVAREA V 2027/00 200524Z SEP 00; NAVAREA V 2021/00 200524Z SEP 00
- sea
- South Atlantic Ocean
- position
- -22.007, -39.332
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 22 SEP BY M/V RAMFORM VANGUARD AND M/V KONDOR EXPLORER TOWING TEN 4800 METER LONG CABLES IN AREA BOUND BY 21-37S 040-00W, 21-37S 038-30W, 22-20S 040-18W, 22-20S 038-30W. FOUR MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 3088/00. 3. CANCEL THIS MSG 23 SEP.
This area · cable & pipeline work
1465 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
21
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic survey in progress until 15 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-08
- Brazil-southeast coast DNC 012016-08-11
- Seismic survey in progress until 23 apr by nps sigma in area bound by 21-10.6S 039-55.5W, 21-10.5S…2016-04-12
- Seismic survey 10 thru 16 apr by nps sigma in area bound by 21-19.4S 039-57.5W, 21-17.3S 039-57.5W, 21-11.2S…2016-04-09
- Seismic survey in progress until 09 apr by M/V nps sigma in area bound by 21-00.6S 039-44.0W, 21-11.4S…2016-04-01
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Recife manoel luis (BF-1) lightfloat 00-49S 044-15W unlitcancels · 2000-09-06
- Recife manoel luis (BF-1) lightfloat 00-49S 044-15W unlitreplaced · 2000-09-06
Nearby now · within 120 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 41.8 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 60.4 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 64.3 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 65.8 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 79.7 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 82.1 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 82.7 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 83.2 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 95.8 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 100.2 nm
- Underwater operations 0800Z to 1800Z daily 08 thru 22 aug by M/V marsanne and M/V comando b in 20-23.57S…Surveys · 107.2 nm
- Underwater operations 1100Z to 2100Z daily 13 thru 22 aug by M/V comando b and M/V am kirti in 20-23.90S…Surveys · 107.2 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.