Cable ops
Seismic survey in progress until 040159Z jan 14 by M/V nps sanco swift towing 12 five mile long cables in…
Brazil-southeast Coast · HYDROLANT 3365/13
- issued
- 2013-12-28 01:17Z
- status
- cancelled 2014-01-04 02:59Z (archive)
- self-cancels
- 2014-01-04 02:59Z
- authority
- NAVAREA V S 1609/13 280016Z DEC 13.
- sea
- South Atlantic Ocean
- position
- -22.639, -39.217
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-SOUTHEAST COAST. 1. SEISMIC SURVEY IN PROGRESS UNTIL 040159Z JAN 14 BY M/V NPS SANCO SWIFT TOWING 12 FIVE MILE LONG CABLES IN AREA BOUND BY 22-12.27S 039-36.52W, 22-51.08S 038-38.93W, 23-04.25S 038-49.37W, 22-26.13S 039-46.78W. SEVEN MILE BERTH REQUESTED. 2. CANCEL THIS MSG 040259Z JAN 14.
This area · cable & pipeline work
1522 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
21
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic survey in progress until 15 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-08
- Seismic survey in progress until 08 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-01
- Seismic survey 17 thru 24 sep by M/V bgp challenger towing 12000 meter long cable in area bound by 25-07S…2016-09-16
- Brazil-southeast coast DNC 012016-08-11
- Seismic survey in progress until 23 apr by nps sigma in area bound by 21-10.6S 039-55.5W, 21-10.5S…2016-04-12
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 36 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 50 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 67.6 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 68.4 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 96.2 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 97.7 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 100.9 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 103.9 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 105.7 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 108.1 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.