Cable ops
Seismic survey in progress until 04 oct by M/V northern access towing 8704 meter long cable in area bound by…
HYDROLANT 3373/00
- issued
- 2000-10-02 05:30Z
- status
- cancelled 2000-10-05 00:00Z (archive)
- cancels
- HYDROLANT 3366/00
- authority
- NAVAREA V 2095/00 020455Z OCT; RCC PIRAEUS AOR-E EGC #417 020455Z OCT 00
- sea
- South Atlantic Ocean
- position
- -21.938, -39.658
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 04 OCT BY M/V NORTHERN ACCESS TOWING 8704 METER LONG CABLE IN AREA BOUND BY 21-30S 039-45W, 21-30S 039-15W, 22-30S 039-35W, 22-10S 040-05W. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 3366/00(54), VESSEL LOCATED. 3. CANCEL THIS MSG 05 OCT.
This area · cable & pipeline work
1480 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
21
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic survey in progress until 15 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-08
- Seismic survey 17 thru 24 sep by M/V bgp challenger towing 12000 meter long cable in area bound by 25-07S…2016-09-16
- Brazil-southeast coast DNC 012016-08-11
- Seismic survey in progress until 23 apr by nps sigma in area bound by 21-10.6S 039-55.5W, 21-10.5S…2016-04-12
- Seismic survey 10 thru 16 apr by nps sigma in area bound by 21-19.4S 039-57.5W, 21-17.3S 039-57.5W, 21-11.2S…2016-04-09
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 28.7 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 49.7 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 52.1 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 59.4 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 61.3 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 63.5 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 64.5 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 64.6 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 77.9 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 82 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 95.5 nm
- Underwater operations 1100Z to 2100Z daily 13 thru 22 aug by M/V comando b and M/V am kirti in 20-23.90S…Surveys · 96.6 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.