Cable ops
Seismic survey in progress until 05 nov by M/V geco tau towing 8300 meter long cable in area bound by 03-30S…
HYDROLANT 3679/00
- issued
- 2000-11-02 04:55Z
- status
- cancelled 2000-11-06 00:00Z (archive)
- authority
- NAVAREA V 2319/00 020432Z NOV 00
- sea
- South Atlantic Ocean
- position
- -3.920, -37.712
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 05 NOV BY M/V GECO TAU TOWING 8300 METER LONG CABLE IN AREA BOUND BY 03-30S 037-55W, 04-50S 036-35W, 04-50S 036-55W, 02-43S 039-10W. SIX MILE BERTH REQUESTED. 2. CANCEL THIS MSG 06 NOV.
This area · cable & pipeline work
355 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Seismic survey 19 thru 27 jan by M/V bgp challenger towing 10000 meter long cable in area bound by 04-09S…2017-01-18
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-10-10
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 1400 meter long cables in area…2015-09-16
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.