Cable ops
Seismic survey in progress until 16 mar by M/V veritas vantage towing eight 7500 meter long cables in area…
Brazil-south Coast · HYDROLANT 419/10
- issued
- 2010-03-11 03:16Z
- status
- cancelled 2010-03-12 06:06Z (archive)
- cancels
- HYDROLANT 410/10
- authority
- NAVAREA V S 434/10 110208Z MAR 10.
- sea
- South Atlantic Ocean
- position
- -25.786, -41.303
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-SOUTH COAST. 1. SEISMIC SURVEY IN PROGRESS UNTIL 16 MAR BY M/V VERITAS VANTAGE TOWING EIGHT 7500 METER LONG CABLES IN AREA BOUND BY 26-02.30S 042-48.15W, 25-56.48S 042-47.98W, 24-33.40S 040-30.35W, 26-47.85S 040-30.40W. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 410/10. 3. CANCEL THIS MSG 17 MAR.
This area · cable & pipeline work
1651 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
23
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Seismic survey in progress until 09 oct by M/V sw diamond towing nine 225 meter long cables in area bound by…2022-10-07
- Underwater operations in progress until 132300Z jul by cableship ile de brehat in: a. 24-03.8S 046-29.2W2017-06-15
- Seismic survey 21 thru 28 jan by M/V polarcus adira towing 9000 meter long cable in area bound by 25-06S…2017-01-19
- Seismic survey 21 thru 28 jan by oceanic champion towing 12 8000 meter long cables in area bound by…2017-01-19
- Seismic survey 14 thru 21 jan by M/V polarcus adira towing 9000 meter long cable in area bound by 25-03S…2017-01-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until 130259Z mar by M/V veritas vantage towing eight 7000 meter long cables in…cancels · 2010-03-09
- Seismic survey in progress until 130259Z mar by M/V veritas vantage towing eight 7000 meter long cables in…replaced · 2010-03-09
- Cancel HYDROLANT 330/10, 419/10 and this msgcancelled by · 2010-03-12
Nearby now · within 120 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.