Cable ops
Submarine cable operations in progress until 110800Z feb by M/V polar prince in area bound by 03-38.3S…
HYDROLANT 456/01
- issued
- 2001-02-07 18:10Z
- status
- cancelled 2001-02-11 09:00Z (archive)
- self-cancels
- 2001-02-11 09:00Z
- authority
- NAVAREA V 256/01 AOR-E EGC #703 071537Z FEB 01
- sea
- South Atlantic Ocean
- position
- -3.534, -38.135
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SUBMARINE CABLE OPERATIONS IN PROGRESS UNTIL 110800Z FEB BY M/V POLAR PRINCE IN AREA BOUND BY 03-38.3S 038-14.2W, 03-37.6S 038-14.0W, 03-26.9S 038-03.1W, 03-24.2S 038-00.0W. TWO MILE BERTH REQUESTED. 2. CANCEL THIS MSG 110900Z FEB.
This area · cable & pipeline work
357 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-10-10
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 1400 meter long cables in area…2015-09-16
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-09-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.