Cable ops
Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. 02 mar along trackline between 01-54.23S…
Brazil-north Coast · HYDROLANT 470/12
- issued
- 2012-03-02 03:51Z
- status
- cancelled 2012-03-03 01:04Z (archive)
- cancels
- HYDROLANT 442/12
- authority
- NAVAREA V N 274/12 020033Z MAR 12.
- sea
- South Atlantic Ocean
- position
- -2.272, -38.331
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-NORTH COAST.
1. SEISMIC SURVEY BY M/V HAWK EXPLORER TOWING
5.4 MILE LONG CABLE:
A. 02 MAR ALONG TRACKLINE BETWEEN
01-54.23S 038-54.22W AND 03-01.67S 037-25.62W.
B. 03 MAR ALONG TRACKLINE BETWEEN
01-15.40S 039-32.58W AND 02-56.93S 037-22.37W.
C. 04 MAR ALONG TRACKLINE BETWEEN
01-29.15S 039-32.58W AND 03-05.58S 037-28.86W.
D. 05 MAR ALONG TRACKLINE BETWEEN
01-43.70S 038-47.55W AND 02-52.60S 037-19.12W.
SEVEN MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 442/12.
3. CANCEL THIS MSG 06 MAR.
This area · cable & pipeline work
352 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-10-10
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 1400 meter long cables in area…2015-09-16
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-09-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. 27 feb along trackline between 02-17.95S…cancels · 2012-02-28
- Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. 27 feb along trackline between 02-17.95S…replaced · 2012-02-28
- Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. 03 mar along trackline between 01-54.23S…cancelled by · 2012-03-03
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.