Cable ops
Seismic survey by M/V wg tasman towing 12 8800 meter long cables: a. 23 and 24 feb along trackline between…
Western South Atlantic · Uruguay · HYDROLANT 506/13
- issued
- 2013-02-23 22:32Z
- status
- cancelled 2013-02-25 12:33Z (archive)
- cancels
- HYDROLANT 498/13
- authority
- NAVAREA VI 113/13 23 FEB 13.
- sea
- South Atlantic Ocean
- position
- -36.092, -51.945
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
WESTERN SOUTH ATLANTIC.
URUGUAY.
1. SEISMIC SURVEY BY M/V WG TASMAN TOWING 12
8800 METER LONG CABLES:
A. 23 AND 24 FEB ALONG TRACKLINE BETWEEN
36-23.83S 051-33.68W AND 35-40.33S 052-16.23W.
B. 24 AND 25 FEB ALONG TRACKLINE BETWEEN
35-47.18S 052-19.73W AND 36-30.72S 051-37.17W.
NINE MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 498/13.
3. CANCEL THIS MSG 26 FEB 13.
This area · cable & pipeline work
497 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-35.59S…2020-09-23
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-35.59S…2020-09-18
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 35-54.40S…2020-09-02
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-19.61S…2020-08-23
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-28
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-16
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey 23 feb by M/V wg tasman towing 12 8800 meter long cables along trackline between 35-47.72S…cancels · 2013-02-23
- Seismic survey 23 feb by M/V wg tasman towing 12 8800 meter long cables along trackline between 35-47.72S…replaced · 2013-02-23
- Seismic survey 25 feb by M/V wg tasman towing 12 8800 meter long cables along tracklines between: a.…cancelled by · 2013-02-25
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.