Cable ops
Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. in progress along trackline between…
Brazil-north Coast · HYDROLANT 517/12
- issued
- 2012-03-07 02:58Z
- status
- cancelled 2012-03-07 17:41Z (archive)
- cancels
- HYDROLANT 490/12
- authority
- NAVAREA V N 295/12 070117Z MAR 12.
- sea
- South Atlantic Ocean
- position
- -2.255, -38.503
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-NORTH COAST.
1. SEISMIC SURVEY BY M/V HAWK EXPLORER TOWING
5.4 MILE LONG CABLE:
A. IN PROGRESS ALONG TRACKLINE BETWEEN
02-00.80S 039-00.85W AND 03-09.92S 037-32.15W.
B. 08 MAR ALONG TRACKLINE BETWEEN
01-15.40S 039-32.58W AND 02-56.93S 037-22.37W.
C. 09 MAR ALONG TRACKLINE BETWEEN
01-29.15S 039-32.58W AND 03-05.58S 037-28.88W.
D. 10 MAR ALONG TRACKLINE BETWEEN
01-32.40S 038-35.80W AND 02-27.95S 039-18.63W.
SEVEN MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 490/12.
3. CANCEL THIS MSG 11 MAR.
This area · cable & pipeline work
342 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-10-10
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 1400 meter long cables in area…2015-09-16
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-09-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. in progress along trackline between…cancels · 2012-03-04
- Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. in progress along trackline between…replaced · 2012-03-04
- Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. in progress along trackline between…cancelled by · 2012-03-07
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.