Cable ops
Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. in progress along trackline between…
Brazil-north Coast · HYDROLANT 557/12
- issued
- 2012-03-10 07:53Z
- status
- cancelled 2012-03-11 13:26Z (archive)
- cancels
- HYDROLANT 519/12
- authority
- NAVAREA V N 316/12 100438Z MAR 12.
- sea
- South Atlantic Ocean
- position
- -2.227, -38.672
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-NORTH COAST.
1. SEISMIC SURVEY BY M/V HAWK EXPLORER TOWING
5.4 MILE LONG CABLE:
A. IN PROGRESS ALONG TRACKLINE BETWEEN
01-32.40S 038-35.80W AND 02-27.95S 039-18.63W.
B. 11 MAR ALONG TRACKLINE BETWEEN
01-28.50S 038-19.15W AND 02-36.30S 039-11.40W.
C. 12 MAR ALONG TRACKLINE BETWEEN
01-45.67S 038-18.72W AND 02-44.22S 039-03.85W
D. 13 MAR ALONG TRACKLINE BETWEEN
01-52.33S 038-10.20W AND 02-52.00S 038-56.20W.
E. 14 MAR ALONG TRACKLINE BETWEEN
01-59.47S 038-02.05W AND 02-58.87S 038-47.82W.
SEVEN MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 519/12.
3. CANCEL THIS MSG 15 MAR.
This area · cable & pipeline work
326 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-10-10
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 1400 meter long cables in area…2015-09-16
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-09-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. in progress along trackline between…cancels · 2012-03-07
- Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. in progress along trackline between…replaced · 2012-03-07
- Seismic survey by M/V hawk explorer towing 5.4 mile long cable: a. in progress along trackline between…cancelled by · 2012-03-11
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.