Cable ops
Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 05 mar along trackline between…
Western South Atlantic · Uruguay · HYDROLANT 571/13
- issued
- 2013-03-05 15:59Z
- status
- cancelled 2013-03-07 00:01Z (archive)
- cancels
- HYDROLANT 568/13
- authority
- NAVAREA VI 128/13 05 MAR 13.
- sea
- South Atlantic Ocean
- position
- -34.724, -51.273
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
WESTERN SOUTH ATLANTIC.
URUGUAY.
1. SEISMIC SURVEY BY M/V RAMFORM VANGUARD
TOWING 12 7000 METER LONG CABLES:
A. 05 MAR ALONG TRACKLINE BETWEEN
33-57.27S 050-05.90W AND 35-01.10S 051-18.85W.
B. 05 AND 06 MAR ALONG TRACKLINE BETWEEN
34-58.40S 051-28.37W AND 34-46.92S 051-46.33W.
C. 06 MAR ALONG TRACKLINE BETWEEN
34-47.37S 051-51.27W AND 35-24.32S 052-29.23W.
NINE MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 568/13.
3. CANCEL THIS MSG 07 MAR 13.
This area · cable & pipeline work
502 within 180 nm since 2000 · 0 in the last 12 months · 0 in force now
00
05
10
15
20
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-35.59S…2020-09-18
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 35-54.40S…2020-09-02
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-28
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-16
- Underwater operations in progress until 302359Z aug by cableship ile de brehat in: a. 36-03.5S 049-41.7W b.…2017-08-16
- Cable operations 150500Z aug to 302300Z sep by cableship ile de brehat in area bound by 34-58.0S 054-54.0W,…2017-08-14
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
- Radiobeacon at chui light 33-44.6S 053-22.5W off air until 17 jan 27Nav aids · 119.8 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.