Cable ops
Seismic survey in progress until 10 apr by M/V ramform viking towing eight 6000 meter long cables in area…
HYDROLANT 587/04
- issued
- 2004-04-08 09:20Z
- status
- cancelled 2004-04-11 00:00Z (archive)
- cancels
- HYDROLANT 438/04
- authority
- NAVAREA V 312/04; NAVAREA V 314/04 08003Z APR
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 10 APR BY M/V RAMFORM VIKING TOWING EIGHT 6000 METER LONG CABLES IN AREA BETWEEN 13-09S 13-45S AND 038-56W 038-31W. FOUR MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 438/04. 3. CANCEL THIS MSG 11 APR.
Timeline
- Radiobeacon and dgps station at abrolhos light 17-57.8S 038-41.5W inoperativecancels · 2004-03-18
- Radiobeacon and dgps station at abrolhos light 17-57.8S 038-41.5W inoperativereplaced · 2004-03-18
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.