Cable ops
Cable laying operations in progress until 24 mar by M/V ile de batz along trackline between 24-01.97S…
Brazil-southeast Coast · HYDROLANT 678/13
- issued
- 2013-03-18 16:00Z
- status
- cancelled 2013-03-25 00:01Z (archive)
- cancels
- HYDROLANT 616/13
- authority
- NAVAREA V S 331/13 181221Z MAR 13.
- sea
- South Atlantic Ocean
- position
- -23.540, -40.223
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-SOUTHEAST COAST. 1. CABLE LAYING OPERATIONS IN PROGRESS UNTIL 24 MAR BY M/V ILE DE BATZ ALONG TRACKLINE BETWEEN 24-01.97S 036-57.30W AND 23-02.82S 043-29.44W. WIDE BERTH REQUESTED. 2. CANCEL HYDROLANT 616/13. 3. CANCEL THIS MSG 25 MAR 13.
This area · cable & pipeline work
1955 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
19
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Seismic survey 21 thru 28 jan by oceanic champion towing 12 8000 meter long cables in area bound by…2017-01-19
- Seismic survey 14 thru 21 jan by oceanic champion towing 12 8000 meter cables in area bound by 25-33.47S…2017-01-10
- Seismic survey in progress until 14 jan by oceanic champion towing 12 8000 meter cables in area bound by…2017-01-07
- Seismic survey 31 dec thru 07 jan 17 by M/V oceanic champion towing 12 7408 meter long cables in area bound…2016-12-30
- Seismic survey in progress until 17 dec by M/V oceanic vega towing 9300 meter long cable in area bound by…2016-12-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 44.2 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 63.7 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 66.6 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 70.8 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 76.8 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 100.3 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 101 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 102.2 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 107.3 nm
- Hazardous operations 0800Z to 2100Z daily 18 thru 20 aug in area within ten miles of 25-06.00S 041-13.00WExercises · 108.3 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.