Cable ops
Seismic survey 040300Z to 100259Z may by M/V cgg alize towing ten 6000 meter long cables in area bound by…
HYDROLANT 835/06
- issued
- 2006-04-30 15:41Z
- status
- cancelled 2006-05-05 07:05Z (archive)
- self-cancels
- 2006-05-10 03:59Z
- authority
- NAVAREA V 269/06 301233Z APR 06.
- sea
- South Atlantic Ocean
- position
- -24.940, -45.405
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY 040300Z TO 100259Z MAY BY M/V CGG ALIZE TOWING TEN 6000 METER LONG CABLES IN AREA BOUND BY 25-04.28S 045-59.10W, 24-25.65S 045-12.27W, 24-48.40S 044-49.50W, 25-27.23S 045-36.27W. FIVE MILE BERTH REQUESTED. 2. CANCEL THIS MSG 100359Z MAY.
Activity windows · 1 in this warning
| opens (UTC) | closes (UTC) | local | length |
|---|---|---|---|
| 2006-05-04 03:00Z | 2006-05-10 02:59Z | — | 143 h 59 |
Parsed from the warning text; outside these windows the area is normally not active, but the warning stays in force until cancelled.
This area · cable & pipeline work
1587 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
23
- Cable operations in progress until 30 mar 24 by cableship durable in: a. 24-05.68S 046-30.76W2023-12-27
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Seismic survey in progress until 09 oct by M/V sw diamond towing nine 225 meter long cables in area bound by…2022-10-07
- Cable operations in progress until 241100Z feb 21 by cableship peter faber and cableship recorder in: a.…2020-11-26
- Cable operations in progress until 251100Z nov by cableship peter faber and cableship recorder in: a.…2020-09-30
- Underwater operations 15 aug thru 21 sep by cableship peter faber and cableship recorder in: a. 35-38.11S…2020-08-14
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
- Odas buoy established in 24-06.36S 045-38.78WNav aids · 51.8 nm
- Laje da conceicao light 24-14.18S 046-41.46W unlit until 24 sepNav aids · 81.9 nm
- Ponta dos meros light 23-13.57S 044-20.83W unlit until 26 sepNav aids · 118.1 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.