Cable ops
Seismic survey in progress until 03 may by M/V ramform valiant towing ten 6000 meter long cables in area…
HYDROLANT 836/06
- issued
- 2006-05-01 06:14Z
- status
- cancelled 2006-05-03 05:39Z (archive)
- cancels
- HYDROLANT 825/06
- authority
- NAVAREA V 274/06 010404Z MAY 06.
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 03 MAY BY M/V RAMFORM VALIANT TOWING TEN 6000 METER LONG CABLES IN AREA BOUND BY 14-22.00S 38-22.00W, 14-22.00S 38-12.50W 12-58.37S 38-13.48W, 13-05.83S 38-22.00W FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 825/06. 3. CANCEL THIS MSG 04 MAY.
Timeline
- Seismic survey in progress until 30 apr by M/V ramform valiant towing ten 6000 meter long cables in area…cancels · 2006-04-29
- Seismic survey in progress until 30 apr by M/V ramform valiant towing ten 6000 meter long cables in area…replaced · 2006-04-29
- Seismic survey in progress until 06 may by M/V ramform valiant towing ten 6000 meter long cables in area…cancelled by · 2006-05-03
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.