Cable ops
Seismic survey 07 apr thru 30 jun by M/V trias towing two mile long cable in area bound by 10-05N 109-02E,…
South China Sea · HYDROPAC 1032/11
- issued
- 2011-04-02 00:09Z
- status
- cancelled 2011-07-01 00:01Z (archive)
- cancels
- HYDROPAC 965/11
- authority
- NAVAREA XI 192/11 012341Z APR 11.
- sea
- South China Sea
- position
- 8.976, 109.422
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
SOUTH CHINA SEA. 1. SEISMIC SURVEY 07 APR THRU 30 JUN BY M/V TRIAS TOWING TWO MILE LONG CABLE IN AREA BOUND BY 10-05N 109-02E, 10-05N 109-03E, 08-08N 109-53E, 08-38N 109-22E. 2. CANCEL HYDROPAC 965/11. 3. CANCEL THIS MSG 01 JUL.
This area · cable & pipeline work
87 within 180 nm since 2001 · 0 in the last 12 months · 0 in force now
01
05
10
15
20
24
- Cable operations until further notice by cableship teneo in 06-47.46N 109-19.20E2024-03-25
- Cable operations 28 jan thru 06 feb by c/s teneo in vicinity 06-47.46N 109-19.20E2024-01-27
- Cable operations 05 thru 14 jul by cableship teneo in vicinity of 07-30.0N 109-06.2E2021-07-04
- Pipeline operations 10 jun thru 31 oct by M/V nile river in vicinity of trackline joining 10-22.2N…2020-06-05
- Pipeline operations in progress until 11 sep by M/V nile river in vicinity of trackline joining 10-22.19N…2020-03-30
- Survey and pipeline operations in progress until 15 oct by M/V ptsc thang long along trackline joining…2019-04-18
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
- Oil rig reported to exists in 07-47.5N 108-12.0EWrecks · 101.6 nm
- Oil rig reported to exists in 07-42.1N 107-55.8EWrecks · 117.1 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.