Cable ops
Seismic survey in progress until 25 feb by M/V cgg alize towing 7000 meter long cable in area bound by…
HYDROPAC 169/05
- issued
- 2005-01-27 15:51Z
- status
- cancelled 2005-02-17 17:31Z (archive)
- cancels
- HYDROPAC 1/05
- authority
- NAVAREA VIII 63/05 271001Z JAN 05.
- sea
- Arabian Sea
- position
- 18.937, 71.150
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 25 FEB BY M/V CGG ALIZE TOWING 7000 METER LONG CABLE IN AREA BOUND BY 18-58.9N 071-01.0E, 19-03.2N 071-12.2E, 18-53.4N 071-16.2E, 18-50.0N 071-12.8E, 18-51.9N 071-04.1E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 1/05. 3. CANCEL THIS MSG 26 FEB.
This area · cable & pipeline work
353 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
24
- Pipeline operations in progress until 15 may by barge leighton stealth and tug britoil 67 in vicinity…2024-05-10
- Cable operations in progress until 10 may by cableship endeavour in area bound by 17-01.62N 069-39.98E,…2024-05-06
- Cable operations in progress until 05 may cableship endeavour along trackline joining 17-01.62N 069-39.98E,…2024-04-30
- Pipeline operations in progress until 18 may by M/V gs rashi in area bound by 19-05.34N 072-06.88E,…2024-04-26
- Cable operations 26 thru 30 apr by cableship endeavour in area bound by 17-25.03N 070-15.89E, 17-24.32N…2024-04-25
- Pipeline operations 26 apr thru 15 may by M/V ltb 300, M/V britoil 72 and M/V britoil 81 along trackline…2024-04-25
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until 02 feb by M/V cgg alize towing 7000 meter long cable in area bound by…cancels · 2005-01-01
- Seismic survey in progress until 02 feb by M/V cgg alize towing 7000 meter long cable in area bound by…replaced · 2005-01-01
- Seismic survey in progress until 05 mar by M/V cgg alize in area bound by 14-15.9N 072-57.9E, 14-29.3N…cancelled by · 2005-02-17
Nearby now · within 120 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.