Cable ops
Seismic survey 01 thru 26 jul by pacific finder towing four 4500 meter long cables in area between 04-26.8S…
Jawa Sea · HYDROPAC 1877/11
- issued
- 2011-06-28 11:48Z
- status
- cancelled 2011-07-27 00:00Z (archive)
- authority
- NAVAREA XI 447/11 281133Z JUN 11.
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
JAWA SEA. 1. SEISMIC SURVEY 01 THRU 26 JUL BY PACIFIC FINDER TOWING FOUR 4500 METER LONG CABLES IN AREA BETWEEN 04-26.8S 04-53.6S AND 110-03.2E 110-39.7E. 2. CANCEL THIS MSG 27 JUL.
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.