Cable ops
Seismic survey in progress until 30 apr by M/V sagar sandhani towing two 5500 meter long cables in area…
HYDROPAC 220/07
- issued
- 2007-02-02 14:48Z
- status
- cancelled 2007-04-25 15:53Z (archive)
- authority
- NAVAREA VIII 80/07 011005Z FEB 07.
- sea
- Arabian Sea
- position
- 20.389, 70.189
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 30 APR BY M/V SAGAR SANDHANI TOWING TWO 5500 METER LONG CABLES IN AREA BOUND BY 20-34.03N 070-05.13E, 20-29.03N 070-22.03E, 20-14.05N 070-18.06E, 20-15.08N 070-08.13E, 20-16.08N 070-01.03E. SIX MILE BERTH REQUESTED. 2. CANCEL THIS MSG 01 MAY.
This area · cable & pipeline work
380 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
24
- Pipeline operations in progress until 15 may by barge leighton stealth and tug britoil 67 in vicinity…2024-05-10
- Pipeline operations in progress until 18 may by M/V gs rashi in area bound by 19-05.34N 072-06.88E,…2024-04-26
- Cable operations 26 thru 30 apr by cableship endeavour in area bound by 17-25.03N 070-15.89E, 17-24.32N…2024-04-25
- Pipeline operations 26 apr thru 15 may by M/V ltb 300, M/V britoil 72 and M/V britoil 81 along trackline…2024-04-25
- Cable operations 24 mar thru 17 apr by vessel maram along trackline joining 18-59.00N 072-37.16E, 18-58.84N…2024-03-23
- Pipeline operations 16 mar thru 15 may by M/V aht maria 1 and M/V miclyn constructor I along trackline…2024-03-11
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.